We moved in July 1990 as a rental. We purchased it in November 1991. Since we purchased our house, we have made many changes to it. It is a 1911 Colonial. Work never ends on this house.
- Remodeled downstairs powder room (1991 & 2005)
- Installed new furnace and removed oil tank (1992)
- Installed shower and renovated upstairs main bathroom (1992)
- Cleaned up the backyard, removing several trees (1992)
- New roof (1992 & 2015)
- Partially finished basement (1993 & 2003 & 2012)
- Rewired home away from knob/post (over time 99% completed)
- New Vinyl Siding (1996)
- Renovated Dining room (1997)
- Renovated Living room (1998)
- New downstairs carpet (1999)
- Renovated 2nd floor SE bedroom (1999) Converted to an office (2014)
- New front walk and retaining wall (2000)
- Kitchen remodel (2005)
- Foyer and stairs(2005)
- New Double-pane windows (2011)
- Renovated NW Bedroom into sewing room (2012)
- Master Bedroom “shrink” & remodel (2013)
- Added master bathroom (2016)
- New upstairs carpet (2016)
- New Furnace and added air conditioning (2017)
- Converted one room in the basement to a fused glass workshop (2018)
- New ceiling in the guest room and second-floor landing/stairs. (2018)
- Renovated SW bedroom (guest room) (2019)
- Refreshed front porch and painted front window trim (2019)
- Front walk repairs post ice-storm, House Roof repaired, garage roof partially replaced, Maple tree repaired) (2021)
- New back fence (2021)
- Dining Room/Foyer/Living Room new flooring (2021)
- Dining room built-in bar (2021)
- New front door (2021)
- Remodel original main bathroom (2021)
- Move sewing room to basement (2022)
- Temporary “Mom” Apartment using both upstairs west bedrooms with cat walk (2022)
- Took out one Locust Tree in the backyard (2023)
- Kitchen Gut/remodel (2024)
- Major projects Left to do
- Trim work for the upstairs landing
- New landscaping in the backyard
- Replace Garage siding