|
|
Asian Transit > Singapore
|
|||||||||||||||||||||||||||||||||||
![]() |
Airport |
The intra airport train network is rather complex. There are several different lines with separate trackways. The equipment used is similar to the car running on the Singapore LRT lines off of the NE MRT line. They are built by Mitsubishi. The trains operate from 5am to around midnight.
The services offered are
Click on any image to enlarge
View
of the train from the Crown Plaza Hotel (8/16/13)
Heading
towards Terminal 3 from Term 2 (8/16/13)
View
from the guideway linking Terminal 2 to terminal 3 (8/16/13)
View from the guideway linking Terminal 2 to terminal 3 (8/16/13)
The
train on the left is the Term 1> Term 2 land side train, the one of the
right is the air side train, view from landside Term 2> 3 link (8/16/13)
Looking
down from the terminal 2 station (8/16/13)
View
from the Terminal 3 station (8/16/13)
View
of the train from the Crown Plaza Hotel (8/16/13)
|
Home Page |
Transit Photos |
Railroad Photos |
Rail Museums |
Tokens/Farecards | |
||||