Facts and
Figures |
Operator |
Tramlink |
System Type |
Light Rail |
Year Opened |
2000 |
# of Lines |
3 |
# of Cars |
24 |
Mileage |
28 km |
Gauge |
Std |
Stations |
39 |
Power |
Overhead |
Fare Media |
POP |
Website |
|
Data Date |
2001 |
1st Visit |
2/2001 |
Last Visit |
2/2001 |
% Rode |
70% |
 |
Croydon Light Rail |
This light rail, or tram, system opened in 2000.
It has three lines that come together to serve Central Croydon. Much of
the lines are on former mainline right of ways. The system connects with
many different mainline railway stations as well as the London
Underground at Wimbledon.
The cars were built by Bombardier. They run as
single car trains. Trains on the Wimbledon-Elmers Lane (Line 1) line
run about every 10~11 minutes Line 2 (Croydon loop - Beckenham Junction)
is every 10-11 min and Line 3 (Croydon loop - New Addington) is every 6-7
minutes.
Click on any image to enlarge.
|