California Transit > Sacramento Light Rail
Meadowview
Year Opened 2003 Lines Served  
Platform Layout 2 side platforms # of Tracks 2
Park-n-Ride YES Right of Way At-Grade
Points of Interest This was the terminal for the south line until the extension to Cosumnes River College opened in 2016
sac-lr-meadowview-041404-02.jpg (59819 bytes)Meadowview terminal (4/14/04) sac-lr-meadowview-041404-05.jpg (61531 bytes)Train waiting to return downtown at Meadowview. (4/14/04)
sac-lr-meadowview-041404-01.jpg (69594 bytes)This train has just arrived at Meadowview, soon the driver will change ends and return back downtown. (4/14/04) sac-lr-meadowview-012804-01.jpg (1585495 bytes)Night view at Meadowview. (1/28/04)
Meadowview station (6/29/09) The layup track are full (6/29/09)
At the Meadowview bumper blocks (6/29/09)  

NEXT STOP

To: Watt / I-80 To: Cosumnes River College
Florin Watt / I-80 West

The Fine Print:

All photos on this website are by Mark Kavanagh. Any and all material contained in this web site may not be reproduced, in any form, without the expressed written consent of Mark Kavanagh, © 1999-2019 all rights reserved. Larger and higher resolution images for all photos are available from the webmaster.

All Logos, symbols for airlines, railroads and transit systems are trademarks and/or copyrighted by the owning airline/railroad/transit system. Ktransit.com is not affiliated with ANY airline, railroad or transit system mentioned on this website.

Become a sponsor of ktransit.com. Put your ad on a specific city for a nominal annual fee. 
 Contact Us for more information.